Wastewater 

Collection

Projects

WEEK OF JANUARY 13, 2020:

Monday:  Line Crew – Hospital Force Main Repair

Camera Crew- Paving List

Pump Crew – Cross Creek Pump Replacement/ work list generated by weekend Lift station run

 

Tuesday: Line Crew – 1223 Noel Ave Tap

Camera Crew – Paving List

Pump Crew – Replace Defective Pump @ Harley Lane and finished work list from weekend

 

Wednesday: Line Crew – Assisted Pump Crew to prepare for potential weather event

Camera Crew – Paving List and Camera Work At WWTP

Pump Crew – Martin Mall Pipe evaluation, Lakeshore 1 Starter Replacement

 

Thursday: Line Crew – Assist Camera Crew with Traffic Control on Chickasaw Drive, Finish Prep for Potential Weather Event.

Camera Crew – Chickasaw Drive Camera Work

Pump Crew – Fueling Stationary Generators/ Building Maintenance at Lift Stations

 

Friday: Line Crew – Shop and Equipment Maintenance/ Manhole Evaluations (if weather allows)

Camera Crew – Paving List (if weather allows)

Pump Crew – Building Maintenance at Lift Stations

 

WEEK OF DECEMBER 23, 2019:

Monday:  Line Crew- Job Prep for Noel Ave Tap/ Assist Vactor with Traffic Control on Chickasaw Drive

Camera Crew- Paving List

Pump Crew – Install Repaired Pump at Hospital Lift Station.

 

Tuesday: Holiday

 

Wednesday: Holiday

 

Thursday: Line Crew- Assist Camera Crew with Traffic Control

Camera Crew- Paving List

Pump Crew- Lift Station run

 

Friday: Line Crew- Assist Camera Crew with Traffic Control

Camera Crew- Paving List

Pump Crew- Lift Station run

WEEK OF DECEMBER 16, 2019:

 

Monday:  Line Crew- CDF 908 Pride Ave/ Reed Ave Manhole Repair/ Manhole List and Manhole Evaluations

Camera Crew- Paving List

Pump Crew – Maintenance @ Old WWTP/ Dismantle and evaluate Hospital Pump

 

Tuesday:  Line Crew- Cold Mix 908 Pride Ave/ Manhole List and Manhole Evaluations

Camera Crew- Paving List

Pump Crew – Draw Down Test List

 

Wednesday: Line Crew- 503 Alan Drive Main Repair

Camera Crew- Paving List

Pump Crew- Maintenance @ Old WWTP

 

Thursday: Line Crew- Manhole List and Manhole Evaluations

Camera Crew- Paving List

Pump Crew- Generator Maintenance

 

Friday: Line Crew- Manhole List and Manhole Evaluations

Camera Crew- Paving List

Pump Crew- Generator Maintenance

 

 

WEEK OF NOVEMBER 25, 2019:

 

11/25/19              Line Crew            2804 Country Club Lane (Main Repair)

                                Pump Crew        Generator Inspections

                                Camera Crew     Paving List

11/26/19              Line Crew            614 Choctaw Drive Road Repair

                                Pump Crew        Maintenance Pump Station Lighting

                                Camera Crew     Paving List

11/27/19              Line Crew            5092 Rosemont (Retire Service)

                                Pump Crew        Maintenance and Draw Down Testing Hospital LS

                                Camera Crew     Paving List

11/28/19              Holiday

11/29/19              Holiday

WEEK OF NOVEMBER 18, 2019:

11/18/19              Line Crew-          614 Choctaw Main Repair

                                Pump Crew -      Install Float hangars

                                Camera Crew –                 Paving List, locate taps

11/19/19:             Line Crew -         Traffic Control Technician Training

                                Pump Crew –     Traffic Control Technician Training

                                Camera Crew - Inspection for Engineering Department, Paving List

11/20/19:             Line Crew -         1055 Briarwood Manhole Replacement

                                Pump Crew -      Draw down testing

                                Camera Crew -  Paving List

11/21/19:             Line Crew -         2804 Country Club Lane Main Repair

                                Pump Crew -      Install Float Hangars

                                Camera Crew -  Paving List

11/22/19:             Line Crew -         Stormwater Pollution Prevention work at 604 McCoy Ave.

                                Pump Crew -      Training Lift station inspections

                                Camera Crew -  Paving List

WEEK OF NOVEMBER 4, 2019:

11/4/19:               Line Crew - Ken Mel Drive Repair/ Raise Bassett Ave Manholes

                                Pump Crew – Install float hangars

                                Camera Crew – Paving List

11/5/19:               Line Crew - 421 Thompson (Relocate 415 Thompson Ave Tap)

                                Pump Crew – Rebuild pump

                                Camera Crew – Paving List

11/6/19:               Line Crew - East Broadway Repair

                                Pump Crew – Install Float Hangars

                                Camera Crew – Paving list

11/7/19:               Line Crew - 762 North Seminary

                                Pump Crew – Draw Down Testing

                                Camera Crew – Paving list

11/8/19:               Line Crew - Dirt work List (if conditions allow)

                                Pump Crew – install float hangars

                                Camera Crew – paving list

 

Some work rescheduled from last week due to rainfall

-Dirt Work at various address

WEEK OF OCTOBER 28, 2019:

10/28/19 –          Line Crew - Raise manholes Bassett Ave, / Groves sewer testing

                                Pump Crew – Oil change generators

                                Camera Crew – Paving list (camera down 10/23 & 24)

10/29/19-            Line Crew – Raise Manholes Deep Creek / Groves sewer testing

                                Pump Crew – Replacing float hangars

                                Camera Crew – paving list

10/30/19-            Line Crew – East Broadway Repair

                                Pump Crew – Replacing Float hangars

                                Camera Crew- Paving list

10/31/19-            Line Crew Asphalt repair Brent Drive & Mooreland Ave.

                                Pump Crew – Replacing float hangars

                                Camera Crew – Paving list

11/1/19 Line Crew – Dirt work list

                                Pump Crew – Draw down Testing

                                Camera Crew – Paving List

 

Dirt work List:    920 N. Main

                                2168 Brent Drive

                                1890 Wildwood Drive

                                631 Stone Lane

                                18 Valley Drive

                                338 Murray Street

                                1013 Ballard Lane

                                1017 Ballard Lane

WEEK OF OCTOBER 14, 2019:

10/14/19

Line Crew – CDF Browning Street & Silkwood sewer repair, Raise manholes on Ayer Drive

Pump Crew – Change oil in Earlington and Mooreland Ave. Generators

Camera Crew – Camera Paving List

 

10/15/19

Line Crew - Repair Driveway at 609 Park Ave. from previous repair, raise manholes on Deep Creek

Pump Crew – re-work float systems in multiple lift station to reduce future problems.

Camera Crew – Paving List

 

10/16/19

Line Crew – Replace sewer tap 338 Murray

Pump Crew – Re-work float systems in multiple lift stations to reduce future problems

Camera Crew – paving list

 

10/17/19

Line Crew – Raise manholes in Yorktown

Pump Crew – Re-work float system in multiple lift stations to reduce future problems

Camera Crew – paving list

 

10/18/19

Line Crew - 723 Gentry Lane – main repair, repair tap for new Ideal Station.

Pump Crew – Repair lighting in pump stations, clean panels at lift stations.

Camera Crew – paving list

Brown Road Sewer Replacement Project October 2019
  • Facebook
  • Twitter
  • Instagram

CONTACT US

City Hall

67 N. Main Street

Madisonville, KY 42431

T: (270) 824-2100

8:00 AM- 4:00 PM

City of Madisonville, recently named Kentucky League of Cities Government of the year.