Public Works
Projects
WEEK OF JANUARY 6, 2020:
W. Center St.- Pipe Repair
Banbury- Tile Repair
Intersection of Buffalo Trace and Shamrock- Utility Cut
Buffalo Trace- Utility Cut
Intersection of S. Franklin and E. Broadway- Utility Cut
Threadneedle- Tile Installation
Weather Permitting- Rosemont- Ditching, dirt-work, seed, net, and straw
WEEK OF DECEMBER 9, 2019:
-Weather Permitting: Pour concrete at Country Club Villas
-Frederick St. Ditching/Laying concrete pipe and head wall
-Preparing salt trucks for winter weather
-Removing sidewalk by building C, to prepare for retaining wall
WEEK OF NOVEMBER 11, 2019:
-Rivendell
-Look at pipe at Pee Wee Lake. May lay pipe across Trucker Schoolhouse (Pee Wee Lake back entrance) while there.
-Country Club Villas- Fix concrete in front of dumpster pad.
-Utility Cuts- Franklin, E. Broadway, and Richmond Dr.
May also start on clean-out of ditch (railroad spur) Baldwin Dr. to behind IAC
WEEK OF OCTOBER 28, 2019:
-Cathlyn Dr.- Tile Repair ( two spots)
-Hodge St.-Putting a catch basin in
-Utility Cuts: Chickasaw, Thompson Ave, N. Franklin, E. Broadway
-Fix hole in back of lot where trailer fell through
-Put a lid in to fix water meter base on lot before it gets busted
-Finish up Airport Remodel-Monday
WEEK OF OCTOBER 21, 2019:
- Airport- Help with furniture
-Utility Cuts: Price Ave, Thompson Ave., and S. Franklin (2 pours)
-Mahr Park- Finish ditching and finish road. Seed, net and straw
-Remove silt from ditch next to butterfly field and haul off
-Woodson- Ditching/brush cut
-Cathlyn- 2 holes
-Audubon Loop- Ditching, fill in, seed and net
-Hodge St.- Catch basin repair
-Claybon- Weather permitting
-Flagging Class- Friday 10/25- for those that need it
WEEK OF OCTOBER 14, 2019:
-Mahr Park- materials are supposed to be here Monday. -Claybon (Football Field)- Weather permitting
-Odd Fellows Cemetery- Ditching -Utility Cuts -Hodge St.- Pour concrete for catch basin lid
-Cathlyn Dr.-holes in yard -Center St. Wheel and Tire- hole to side of parking lot